01
Fault finding & repair
Tripping breakers, dead circuits, intermittent faults that only show up in the rain. We work with insulation resistance and loop testing rather than guesswork, and we tell you what we found before we start replacing parts.
Domestic & small commercial electrical
Coda Grain is a two-van outfit. We test before we quote, write down what the work actually involves, and hand over a certificate you can give a buyer, a lender or a letting agent.
Five lanes of work
We keep the list short on purpose. If a job sits outside it we will say so on the phone rather than learn it on your floor.
01
Tripping breakers, dead circuits, intermittent faults that only show up in the rain. We work with insulation resistance and loop testing rather than guesswork, and we tell you what we found before we start replacing parts.
02
Replacing rewireable fuse boxes and early plastic boards with a metal unit, RCBO protection per circuit and surge protection where it earns its place. Circuits are tested, labelled and recorded on the schedule.
03
Whole-house rewires staged room by room so you can stay in the building, plus new circuits for kitchens, lofts, garden rooms and workshops. We agree socket and switch positions on site before anything gets chased in.
04
Replacing yellowed downlights with warmer dimmable fittings, adding two-way switching where someone has to cross a dark landing, and setting up outdoor lighting that is actually weather-rated for the position it sits in.
05
Charger installs that start with a supply check, not a product page: main fuse rating, earthing arrangement, cable route and load management if the house already runs an electric shower and a heat pump. Ovens and showers follow the same approach.
Work out what you are dealing with
Open the line that matches your symptom. Each one gives the usual cause and the first thing we would do about it, so you know roughly what the visit involves before you book.
No surprises on the invoice
The same four steps whether it is a single socket or a staged rewire.
We look at the board, the earthing, the circuits involved and the access we will need. Nothing is priced from a photo.
You get a works list in plain language: what changes, what stays, what gets tested and what we expect to find behind the plaster.
Dust sheets down, circuits isolated one at a time where we can, and the building left usable at the end of each day.
Circuits tested and labelled, results recorded, certificate issued, and five minutes spent showing you where everything now lives.
Specification & finish
The parts of a job you only notice later — labelling, routing, make-good — are the parts we hold ourselves to.
Availability
| Day | Mostly kept for | Good to know |
|---|---|---|
| Monday | Faults and repairs | First calls of the week go to anything that left a property without power over the weekend. |
| Tuesday — Thursday | Planned installation work | Board changes, new circuits and rewire stages, booked as full or half days. |
| Friday | Surveys and quoting | EV charger and rewire surveys, plus second visits to agree socket and lighting positions. |
| Weeknight slots | Small jobs after hours | A limited number of early-evening appointments for single accessories and quick repairs. |
| Saturday morning | Certification & reports | Condition reports and landlord certificates, useful when a property is between tenants. |
Before you book
New circuits and board changes get an Electrical Installation Certificate with the full test schedule. Alterations to an existing circuit get a Minor Works certificate. A survey of an existing installation produces a condition report with coded observations. If you are told a job needs no paperwork at all, ask why.
A periodic condition report on the installation, renewed on the schedule your tenancy rules require, plus certificates for any work done between reports. We write reports so the observations are readable: what must be fixed now, what should be monitored, and what is simply older than current practice but safe.
Often it is not needed. Age alone is not a fault. We test first and look at cable condition, earthing and insulation resistance. Plenty of houses need a board change and two new circuits rather than a rewire. If a rewire genuinely is the right answer, you will see the test results that led us there.
Yes, with one condition: we test what is already in before we add to it, and that test is chargeable. We cannot certify work we have not verified, and we will not bury an unknown joint under new plaster. Occasionally the honest answer is to pull a run back and start it again.
Fault finding and accessory work is usually a few hours with minimal disturbance. Board changes mean a planned power-off, so we agree the window in advance. Rewires are dusty by nature — we stage them room by room, sheet the route, and leave you with working kitchen and bathroom circuits each evening.
No. Rubber or lead-sheathed cable and a rewireable fuse box are worth replacing, but mid-era PVC installations frequently test well and only need modern protection at the board. The deciding factor is what the instruments say about insulation, earthing and continuity, not the date on the paperwork.
Usually. We isolate circuit by circuit, keep tills, fridges and routers live where the installation allows it, and schedule anything that needs a full shutdown for the quietest window you can give us. Tell us the constraint in your enquiry and we will plan the sequence around it.
Book a visit
A short description beats a long one. The more precisely you can say what happens and when, the better we can judge the length of the visit and what to put on the van.